Approximate Lead Time - 10 Production Days
BASKET LIFT, CARRIAGE GUIDE BAR, CF-400
1/2" dia X 18" rod, ground & polished, drilled & tapped
For CF-400 basket lift assembly, out of production model, probable long lead-time or limited availability
208V ELEMENT ASSEMBLY, CF-500 FRYER
NOTE: UNIT IS OUT OF PRODUCTION, AVAILABILTIY IS LIMITED